In the UK, DSV operates from 30 locations and has worked with us on warehouse projects over the last decade. These have often been complex installations requiring the design, supply and fit-out of three-tier mezzanine floors and shelving. Through involving us at the initial warehouse design phase, DSV have been able to tap into our considerable experience in racking and mezzanines, facilitating the creation of fully bespoke solutions designed to maximise DSV’s stored goods capacity.
With each project, extensive consultation with DSV and its architects, together with meticulous planning, ensured that all projects ran smoothly and were complete on time. As an example, DSV asked us to quote for a substantial mezzanine floor for its new warehouse in Northamptonshire. We designed and installed a three-tier mezzanine to encompass the entire warehouse, installed two staircases to provide emergency escape, designed and installed a main access staircase, a partition wall and truck protection to columns.